Storm Drain Study, Strawberry Creek Watershed at University of California, Lawrence Berkeley Laboratory

Abstract: 

The purpose of this study has been to analyze the adequacy of the existing storm drainage facilities during a major storm of design intensity and to evaluate the impact of present and proposed future LBL developments within the watershed.
This report considers the watershed area above Gayley Road only and does not discuss the flow in the channels within the portion of Campus situated below Gayley·Road.

Author: 
G T Kuntz, Consulting Engineer
Publication date: 
March 10, 1980
Publication type: 
Report